ICE NLD - Nottingham Trams Railway Bridge Design and Construction.
This is a joint event with IStructE.
6.30-8.30pm (refreshments served from 6pm)
Speakers: Raymond Sexton, Structures Team Lead, Mott MacDonald and Paul Channon, Section Manager, Taylor Woodrow.
As part of Nottingham’s £500M tram network extension there will be several major new structures constructed throughout the city centre and out towards the two new park and ride facilities at the end of the new lines.
At the heart of the city centre is the work taking place at Nottingham train station where a new two span 104m long tubular steel truss bridge will installed over the live railway station.
>>Download Event Flyer
Contact Luigi Sorrentino on luigi.sorrentino@nicholls-colton.co.uk for more information.
Disclaimer: Any views or opinions expressed on any matters by the presenters or participants during or in connection with this presentation are solely the views of the authors of the respective comments and/or opinions and must not be taken to be the views of ICE or any other organisation. ICE makes no representations, warranties or assurances concerning any information provided in these presentations and accepts no responsibility for the content and/or accuracy.