Already registered?

We can highlight events that match your profile.  Login now

Date 13 APRIL 2013
Time 09:00 - 12:00
Event Type Site visit

Please noted that this event has been full.

The project aims to widen Tolo Highway/Fanling Highway between Island House Interchange and Tai Hang to alleviate the traffic congestion problem on the Tolo Highway.  Project cost is estimated of about HK$ 4,487 million.

The technical site visit will concentrate on the works under Contract No. HY/2009/08.  The Works to be executed under this Contract include, but not exclusively, the following major items -

(a) Widening of about 3.5km of existing Tolo Highway from existing dual 3-lane to dual 4-lane between Ma Wo and Tai Hang;

(b) Construction of Bridges No. 12A, 13A, 15A, 18A, New Lam Kam Road Flyover, and Tai Po Tai Wo Road Link Bridge Nos 1, 2 and 3;

(c) Demolition of Existing Brdge No. 18;

(d) Modifications of existing Bridge No. 12 (N512), No. 13 (N513), No. 15 (N515)and existing Lam Kam Road Flyover (N555);

(e) Slopeworks and construction of retaining walls;

(f) Civil and structural works, and all other works necessary to cater for the implementation of the electrical and mechanical works for the traffic control and surveillance system (electrical and mechanical works by others) from Ma Wo to Tai Hang;

(g) Drainage works including extension of cross-road drainage, culverts and stream diversion works;

(h) Provisioning of mitigation measures which are identified and/or recommended in the Traffic Impact Assessment, Environmental Impact Assessment and Drainage Impact Assessment;

(i) Civil, drainage, structural, geotechnical, traffic aids, landscape works, waterworks, fire hydrants installation, and electrical and mechanical installations associated with the road widening works;

(j) Entrustment of waterworks, entrustment of sewer works; and

(k) Routine Maintenance of Road Network. 
 

Book online

Fee: Free of Charge
Language: Cantonese

*Safety Helmets and Reflective Vests will be provided but visitors are reminded to wear sturdy footwear.

Registratinon starts at 9:00 for 9:15-12:00


Only successful applicants will receive confimration letter, if you do not receive it before 5 April, please regard your application as unsuccessful.

Enquires: 31534181

Disclaimer: Any views or opinions expressed on any matters by the presenters or participants during or in connection with this presentation are solely the views of the authors of the respective comments and/or opinions and must not be taken to be the views of ICE or any other organisation. ICE makes no representations, warranties or assurances concerning any information provided in these presentations and accepts no responsibility for the content and/or accuracy.

Address

Construction sites of Widening of Tolo Highways
Project
Tai Wo
New Territory
Hong Kong

Directions

Give me directions to this event

More on this subject

Books

Knowledge

There are no related pages

Events

    No related Events.