Beverley Integrated Transport Study, Hull

17 March, 2016 | 18:30 - 20:00

Beverley Integrated Transport Plan, aerial view.
Beverley Integrated Transport Plan, aerial view.

About this event

The integrated plan was developed because of severe traffic congestion in Beverley Town Centre and the associated problems of traffic noise, pollution and serious impacts on other road users particularly pedestrians and mobility impaired.

The package of measures involves: construction of a southern bypass; upgrading of roundabouts; reclassifications of roads and improved signage at a total cost of £22m.

Speakers

Richard Lewis - Civil Engineering Services Manager at East Riding of Yorkshire Council
Malcolm Smith - Principal Engineer at East Riding of Yorkshire Council
Paul Suret - Principal Engineer at East Riding of Yorkshire Council

See the "speakers" tab for more information.

Contact

For more information and to book, please contact: yorkshireandthehumber@ciht.org.uk

A joint meeting with CIHT, refreshments from 18.00.

Speakers

Richard Lewis - Civil Engineering Services Manager at East Riding of Yorkshire Council

Richard has over 25 years' experience in the public and private sectors. In his current role he has responsibility for the design, project management and delivery of the Council's highways capital and revenue schemes, planned highway maintenance, flood risk management function, flood alleviation schemes, structures, coastal, street lighting design and road safety functions.

Malcolm Smith - Principal Engineer at East Riding of Yorkshire Council

Malcolm has over 40 years' experience within a local authority environment. Since 1996 Malcolm has led multi-disciplinary teams covering Road Safety and Engineering design, delivering a vast array of civil engineering projects. Over the past few years Malcolm has predominantly carried out the role of NEC3 Project Manager creating, directing and managing a team supervising the construction of major highways schemes.

Paul Suret - Principal Engineer at East Riding of Yorkshire Council

Paul has 38 years' experience. In the early part of his career Paul developed considerable experience on major trunk road and motorway schemes with Humberside County Council and more recently became a Principal Engineer of one of the delivery teams responsible for delivering major highway and flood alleviation schemes as well as delivering the LTP programme of works.

Top