Canning Town flyover, London

15 October, 2015 | 18:00 - 20:00

Canning Town flyover, London

About this event

The design and structural form of the viaduct will be considered along with the solution in terms of the instrumentation measurement and hydraulic control.

The real time information and alerts that were available to engineers will be covered along with how the movement was managed when the Tunnel Boring Machines (TBMs) passed under the structure, and other potential uses of the technology.

The presentation will look at the requirements with regard to settlement mitigation and Crossrail tunnelling.

Speakers

  • David Holland, Mabey
  • Kim West, ARUP
Top