Challenges in the drilling and blasting method at main access tunnel – Uma Oya Project, London

  • Lecture
  • 07 September 2017
  • 18:00 - 20:00
Challenges in the drilling and blasting method at main access tunnel – Uma Oya Project, London

About this event

The Uma Oya multipurpose project is a hydropower project in Sri Lanka with several tunnels over 25 km in length, mostly in hard rock. This presentation will describe some of the challenges and solutions in the Drilling and Blasting method used in this project during construction.

Excavation of the underground powerhouse complex and associated tunnels will be explained and improvements in the drill and blast patterns implemented during the construction of this project will be described. (Excavation of tunnels: 2011-2015)

Speaker

Mehdi Hosseini – London Bridge Associates

Join online

This event is being broadcast online. Please join the lecture up to 10 minutes before the start time of 6pm.

Join this event online

Event venue

Institution of Civil Engineers
One Great George Street
Westminster
London
SW1P 3AA
United Kingdom

For more information please contact:

Shelly-Ann Russell

e: shelly-ann.russell@ice.org.uk
t:

Tags:

Top