Design and installation of record breaking dock gates, Crawley

6 April, 2017 | 17:30 - 19:30

A crane lifting the record breaking lock gates
A crane lifting the record breaking lock gates

About this event

In 2016 Sembcorp Marine installed the world’s largest spanning (non-propped) flap gate at Phase II of their new shipyard in Singapore. This record breaking dock gate was designed in 2015 by Royal HaskoningDHV.

This presentation will briefly explain the development of dock gates over the years and talk through some of the issues that had to be dealt with during the design and installation of some of the largest gates in the world.

Speaker

Richard Bowman (Royal HaskoningDHV)

Richard Bowman is a Civil Engineer with over 15 years of experience in the design, assessment and installation of dock and lock gates, both in the UK and overseas. This experience includes small flood control structures to some of the world’s largest dock gates.

 

Event materials

The following materials are available for download:

Top