Reclamation design at Port of Felixstowe, Exeter

17 March, 2016 | 18:00 - 20:00

Construction on a new quay at the Port of Felixstowe.
Construction on a new quay at the Port of Felixstowe.

About this event

The design of the sheetpile wall was dependent on the performance of the fill material placed within the reclamation.

This talk will be about the design and methods of improvement of the fill properties to fulfil the client's long-term settlement requirements and optimise the sheetpile design.

Event materials

The following materials are available for download:

Top