Selkirk Flood Protection Scheme, Glasgow

6 October, 2016 | 17:30 - 20:00

Storm Frank – 30th December 2015 – why flood protection schemes are so important.
Storm Frank – 30th December 2015 – why flood protection schemes are so important.

About this event

From concept to construction – a review of the incredibly diverse nature of consulting engineer involvement for delivery of the £32million Selkirk flood protection scheme.

From angry residents to Great Crested Newts, this event will cover the professional and personal peaks and troughs experienced during the seven-year lifespan of this major Scottish Borders project.

From its inception in Autumn 2009 to projected completion in winter 2016, the Selkirk Flood Protection Scheme was the first scheme with an Environmental Statement to be taken forward under the Flood Risk Management (Scotland) Act 2009.

CH2M provided the design, consultation and site supervision services over the entire project period to deliver a scheme which protects over 600 properties from the effects of the one-in-200-year-plus climate change flood event. This event will cover how the design and management team dealt with some interesting challenges including:

  • Adapting an existing loch for the purposes of flood storage
  • Dealing with extremely permeable subsoils
  • Learning how a new piece of legislation works in practice
  • Liaising with scheme objectors
  • Liaising with members of the public surprised by the magnitude of engineering works required
  • Unusual protected species
  • Managing frustrations and non-compliances during construction

Contact

For further information, please contact Robbie Clark at robbie.clark@mclhc.co.uk.

Registration and refreshments from 5.30pm for a 6.15pm start.