Tideway: Learning lessons from the Lee Tunnel secondary lining, London

  • Lecture
  • London
  • 28 March 2019
  • 09:00 - 16:00
Tideway: Learning lessons from the Lee Tunnel secondary lining, London

Watch this event

Thames Tideway

In 2014 over 50,000m3 of fibre-reinforced concrete were used to line the 6.9km long Lee Tunnel.

During stormwater surge events, the tunnel routinely experiences internal pressures of up to 7.5bar, temporarily putting the lining into tension. To ensure 120yr design life, longitudinal joints were not permitted; the secondary lining had to be constructed as a full-round pour. This required both a highly technical concrete mix and sophisticated tunnel shuttering system.

The achieved concrete finish above tunnel knee level was superb; however the tunnel invert required extensive remedial work. Between 2019 and 2021 over 250,000m3 of concrete will be used to line the 25km long Tideway Tunnel.

This presentation explains how five key lessons from Lee Tunnel and are being implemented to ensure no remedial works are required, leaving a lasting legacy of superb homogenous concrete.

Speakers

John Corcoran

Section Manager, BMB

Event venue

Institution of Civil Engineers
One Great George Street
Westminster
London
London SW1P 3AA
United Kingdom

For more information please contact:

ICE Events Team

e: [email protected]

Top