Challenges in the drilling and blasting method at main access tunnel – Uma Oya Project, London

7 September, 2017 | 18:00 - 20:00

Venue address:

Institution of Civil Engineers
One Great George Street
Westminster
London SW1P 3AA
United Kingdom
Find out the challenges of drilling and blasting rock.
Find out the challenges of drilling and blasting rock.

About this event

The Uma Oya multipurpose project is a hydropower project in Sri Lanka with several tunnels over 25 km in length, mostly in hard rock. This presentation will describe some of the challenges and solutions in the Drilling and Blasting method used in this project during construction.

Excavation of the underground powerhouse complex and associated tunnels will be explained and improvements in the drill and blast patterns implemented during the construction of this project will be described. (Excavation of tunnels: 2011-2015)

Speaker

Mehdi Hosseini – London Bridge Associates

Join online

This event is being broadcast online. Please join the lecture up to 10 minutes before the start time of 6pm.

Join this event online

Event materials

The following materials are available for download:

Disclaimer: Any views or opinions expressed on any matters by the presenters or participants during or in connection with this presentation are solely the views of the authors of the respective comments and/or opinions and must not be taken to be the views of ICE or any other organisation. ICE makes no representations, warranties or assurances concerning any information provided in these presentations and accepts no responsibility for the content and/or accuracy.