
Etienne Baranger
principal project director
Event organised by ICE
Free
Watch onlineThe Trunk Road T2 and the Cha Kwo Ling(CKL) Tunnel form the middle section of Route 6. They connect the Central Kowloon Route(CKR) to the west and the main tunnel of the Tseung Kwan O –Lam Tin Tunnel (TKO-LTT) to the east. Route 6 forms part of Hong Kong’s strategic road network and provides an important road link from West Kowloon to Tseung Kwan O (TKO) New Town with intermediate interchanges at Kai Tak and Lam Tin.
Upon commissioning of Route 6, it is estimated that the journey time during the peak hours between the western entrance/exit of the TKO-LTT, i.e. Lam Tin Interchange, and the eastern entrance/exit of the CKR, i.e. Kai Tak Interchange would be reduced from about 15 minutes to about 3 minutes. The public can have a more convenient express access between Kowloon East and West and amongst the developments along the route.
In this webinar, the speakers will share design considerations and the methodology being adopted in Trunk Road T2 and the Cha Kwo Ling (CKL) Tunnel for the launching shaft construction, TBM assembly and common utility enclosure structure.
This event is being shown online. Register to get access.
principal project director
TBM
senior construction manager
Free
Watch online