New advances in civil engineering – New developments in Tunneling Works in Hong Kong

27 September, 2017 | 19:00 - 20:30

Venue address:

CityU SCOPE Admiralty Learning Centre
8/F United Centre
95 Queensway
Admiralty
Hong Kong
New advances in technology means better tunnels.
New advances in technology means better tunnels.

About this event

Large span mined tunnels in soft ground: support design, instrumentation and observational approach:

The northern 200m of the Liantang Lung Shan road tunnels in Hong Kong comprises large span mined tunnels excavated through poor ground with low cover. Conventional staged tunnel excavation techniques, with heading (160m2) and bench (115m2), were adopted. An instrumented observational approach was developed to verify an optimised temporary support system for these challenging ground conditions.

Ribs were instrumented and limit settlement and load values defined which, if respected, allowed the omission of top heading invert beam and increased bench advance lengths equating to a more efficient construction progress. This comprehensive monitoring scheme enhanced control and safety of the works allowing a clearer understanding of load evolution through the various stages. A comparison of the initial and optimised design together with the monitoring measures implemented will be presented.

Pilot TBM tunnel enlargement:

Due to a tight 350m horizontal curve, the northern 500m of the Liantang Lung Shan road tunnels comprise mined tunnels of larger span (3m wider than the standard two lanes 14m TBM diameter bored tunnel), in order to provide sufficient visibility to the road users.

For programme reasons it was not possible to wait for the 500m long mined tunnel to be completed before the 14m diameter TBM was launched in the southbound tunnel to bore the 2,400m long segmental lining tunnel towards the mid-ventilation junction cavern.

As a consequence the TBM was launched within the horizontal curve, at 200m from the North Portal, and the 300m long 14m diameter TBM "pilot" tunnel within the curve subsequently had to be enlarged using mined tunneling technique to its final shape.

A 320m long temporary steel gallery was installed within the 14m diameter segmental lining tunnel, allowing the TBM logistics & continuous segments feeding through the gallery, while the tunnel enlargement of the top heading could carry on from the top of the gallery.

The concrete segments were broken ring by ring and a special impact gantry tool was used to control the segments fall onto the steel gallery. Further enlargement excavation and temporary supports installation were done, following various designs according to the variable ground conditions encountered. The enlargement of the bench was carried out in sequence with the dismantling of the temporary gallery and the TBM logistics equipment rearrangement.

Capacity: 120pax
Free of charge

Remarks:

*Priority will be given to ICE members.
*ICE will send confirmation e-mail to successful applicants.

Register your attendance

To book your place, simply click the 'book now' button below and follow the onscreen instructions. If you experience any issues, please contact the event administrator: crystal.fung@icehk.org.hk.

Book now

Disclaimer: Any views or opinions expressed on any matters by the presenters or participants during or in connection with this presentation are solely the views of the authors of the respective comments and/or opinions and must not be taken to be the views of ICE or any other organisation. ICE makes no representations, warranties or assurances concerning any information provided in these presentations and accepts no responsibility for the content and/or accuracy.

Speakers

Xavier MONIN

Design Manager of the Liantang Lung Shan Tunnels Project for Dragages Hong Kong Ltd since end of 2013.

Xavier has 16 year experience in design management on large-scale international linear projects (tunnels, railways, highways), for both designs done in-house and sub-contracted to international design offices.

He graduated from the Ecole Centrale Paris and joined the French construction company Bouygues Travaux Publics in 2001. He has been Project Design Manager for Dragages Hong Kong Limited on the CEDD's Liantang-Heung Yuen Wai Boundary Point Site Formation and Infrastructure Contract 2 since end of 2013.

Vincent TRICOT

Method Manager of the Liantang Lung Shan Tunnels Project for Dragages Hong Kong Ltd since end of 2013.

Vincent has over 17 year experience in methods and construction of underground works (railways & roads tunnels, shafts, stations), as well as other infrastructure and maritime works.

He graduated from the Ecole Spéciale des Travaux Publics in Paris and joined the French construction company Bouygues Travaux Publics in 2002. He moved to Hong Kong in 2011 to work in Dragages Hong Kong Limited (DHK) as Construction Method Manager on the MTRC Express Rail Link Contract 821. He has been Project Construction Method Manager for DHK on the CEDD's Liantang-Heung Yuen Wai Boundary Point Site Formation and Infrastructure Contract 2 since end of 2013.

Top