Skip to content
Search
Type
Lecture

A1 Junctions: Phase 2

Event organised by ICE

Date
12 November 2018
Time
18:00 - 19:15 GMT
Location
Online

This event has now ended

You can catch-up on details or any broadcast and downloads here.

Overview

The A1 Junctions Phase 2 Project will involve a number of improvements to the existing A1 dual carriageway between the Hillsborough Roundabout and the existing underpass junction at Loughbrickland. The A1 dual carriageway which links Belfast and Dublin is part of the Eastern Seaboard Key Transport Corridor and currently caters for up to 40,000 vehicles per day.

The project will involve the construction of four new compact grade separated junctions, a northbound on-slip at Castlewellan Road (Banbridge), a link road between the existing Hillsborough Road Junction and Milebush Road (Dromore) and the closure of nine selected side roads. In conjunction with these improvements 21 side roads will be converted to left in left out configuration, all existing gaps within the central reserve will be closed and a continuous vehicle restraint system installed.

The lecture will focus on how the design developed from Stage 2 to Stage 3 of the DMRB Scheme Assessment Process, focusing on the engineering, social and environmental factors that require consideration when developing and designing a road project within an existing transport corridor.

Sponsored by

Hays

For more information please contact:

Georgia Hamilton