- Date
- 15 March 2018
- Time
- 18:00 - 20:00 GMT
- Location
-
Institution of Civil Engineers One Great George Street Westminster London London, SW1P 3AA United Kingdom
This event has now ended
You can catch-up on details or any broadcast and downloads here.
Watch recording
Overview
This presentation will focus on the design and construction of the Sprayed Concrete primary lining tunnel junctions at Farringdon Station. The behaviour of the SCL tunnel junctions based on the recorded monitoring data will be discussed.