Hinkley Point C Nuclear Power Station Tunnelling and Marine Project, webinar

Event organised by The British Tunnelling Society

Date
17 June 2021
Time
19:00 - 20:30 BST (GMT+1)
Location
Online
Online,
United Kingdom

This event has now ended

You can catch-up on details or any broadcast and downloads here.

Overview

This presentation will cover the many engineering challenges faced in the construction of these works and how the team overcame unique logistical challenges.

Summary

The main cooling water supply for the Hinkley Point C nuclear power station will be fed from four intake head’s which will be located on the seabed of the Bristol Channel. The water will travel along long 2 separate segmentally lined tunnels into the power plant completing its loop by returning to sea via a third tunnel. Onshore, the tunnelling construction works include 3 shafts, 8 primary lined tunnels and a number of complex secondary lined structures.

In this lecture, Pat & Matt will discuss the many engineering challenges faced in the construction of these works and how the team overcame unique logistical challenges, difficult ground conditions and challenging weather to build the Head’s and the tunnels to nuclear standards throughout the global pandemic.


 