Skip to content
Search
Type
Lecture

RCEA Annual Conference – HS2 - Taking the project forward

Event organised by Railway Civil Engineers' Association

Date
28 April 2022
Time
15:00 - 17:30 BST (GMT+1)
Location
Institution of Civil Engineers
One Great George Stret
Westminster
London, SW1P 3AA
United Kingdom

This event has now ended

You can catch-up on details or any broadcast and downloads here.

Overview

HS2 is a state-of-the-art, high-speed line critical for the UK’s low carbon transport future. It will provide much-needed rail capacity across the country, and is integral to rail projects in the North and Midlands – helping rebalance the UK economy.

By moving long-distance traffic from our current rail network onto HS2’s new high-speed line, we will create the extra room needed to improve local, regional and freight services.

HS2 trains will be powered by zero-carbon energy from day one of operation, offering a cleaner alternative to long-distance car journeys and domestic flights. This commitment will play a key part in supporting HS2 Ltd’s aim to make the project net zero carbon from 2035, with targets of diesel-free construction sites and reducing the carbon content of steel and concrete.

This Railway Civil Engineers Association event, both in-person at the ICE and online, will give an update as the project moves forwards. The event will include:

  • Networking buffet lunch at ICE, One Great George Street, London
  • Key Note Speech – HS2 Project Update by David Coles, Chief Engineer at DfT
  • HS2 Stations – Creating 21st-century transport hubs talk by Ian Blight, HS2 Stations Technical Director
  • HS2 Track – Linking the Network talk by Gheorghe Nicoara, HS2 Head of Track Engineering
  • HS2 Phase 2 – Planning & Delivering the Next Phase – presentation by Dr Alistair Hitchcock, HS2 Phase 2 Head of Engineering

Programme

13:45 - 14:00

Registration

14:00 - 14:05

Introduction & Welcome – Jonathan Buttery, RCEA Chair

14:05 - 14:20

HS2 Key Note Speech – David Coles, Chief Engineer, DfT

14:20 - 14:40

HS2 Stations – Ian Blight, Stations Technical Director

14:40 - 15:00

HS2 Track – Gheorghe Nicoara, Head of Track Engineering

15:00 - 15:15

Audience Q&A

15:15 - 15:30

Break

15:30 - 16:00

HS2 Phase 2 Planning & Delivering the Next Phase – Alistair Hitchcock

16:00 - 16:30

Audience Q&A

16:30 - 16:35

Round-Up and Meeting Closed

Speakers

David Coles

David Coles

Department for Transport

chief engineer

Read more

David Coles

David joined the Department for Transport’s High Speed 2 team in 2016 and was recently appointed Chief Engineer for the whole department. He leads a team advising on all technical and operational aspects of DfT’s infrastructure projects, their influence on cost and value and where we should be looking to innovate. He also leads DfT’s carbon management programme whose aim is to reduce capital carbon - the greenhouse gas emissions generated by building, maintaining and renewing transport infrastructure – to meet our Net Zero commitments.

Ian Blight

Ian Blight

HS2 Stations

technical director

Read more

Ian Blight

Ian is currently HS2’s Stations Technical Director, as a member of the Engineering Delivery Partner, and is also Jacob’s Global Director for High Speed Rail.

Ian commenced work on HS2 as the Head of Delivery, managing the work of the Profession Services Consultants who together with HS2, deposited the Phase 1 Bill in 2013 and then technically supported the Bill’s passage through Parliament until it’s Royal Assent in 2017. Since then, Ian has been in his current role on HS2 as the design, procurement and construction of the Phase 1 stations have progressed.

Gheorghe Nicoara

Gheorghe Nicoara

HS2

head of track engineering

Read more

Gheorghe Nicoara

Gheorghe is a Fellow of ICE and joined HS2 team in 2020 as a Head of Track Engineering. He leads the track alignment, gauging, track system and survey team responsible for all track engineering and railway system survey across the HS2 phase 1, 2a and 2b. He is also the track subject matter expert and owner of all track and survey related standards.

Dr Alistair Hitchcock

Dr Alistair Hitchcock

HS2

phase 2 head of engineering

Read more

Dr Alistair Hitchcock

Alistair joined HS2 Ltd in 2021 as Head of Engineering for Phase 2 having previously worked on the project for 10 years in consultancy. He leads the engineering teams in both Phase 2a and Phase 2b with a remit covering technical guidance and assurance. A particular focus is on driving cost and carbon from the scheme during the early stages and developing the delivery strategy for the Phase 2b western leg.

For more information please contact:

Elira Alushi