Overview
The presentation will cover the application of modern technology and innovative approaches which successfully led to the full replacement of the supply and scour pipework and valves at Talybont Reservoir in South Wales, formed by a 30m high embankment dam. It will explain how the use of siphons were able to maintain supply and compensation water throughout the duration of the construction during one of the driest summers on record in the UK.
Isolation of the mid-level drawoff required unusual underwater excavation and engineering. Advanced underwater surveys and the application of robotics enabled the isolation of the low-level drawoff and scour pipework and valves. The presentation will include the challenges encountered in developing and implementing the strategies which successfully facilitated safe replacement of the drawoff works without impacting the security of water supply.
For more details on how to view this meeting online, including at one of our Regional Hubs in Glasgow, Warrington, Leeds or Cardiff, please download the BDS regional flyer or visit the meeting page on the BDS website: www.britishdams.org.