Skip to content
Search
Type
Lecture

The A483/A489 Newtown Bypass, Cardiff

Event organised by ICE

Date
10 April 2019
Time
18:30 - 20:30 BST (GMT+1)
Location
Cardiff University School of Engineering
Trevithick Lecture Theatre (T2/09)
The Parade
Cardiff
Cardiff, CF24 3AA
United Kingdom

This event has now ended

You can catch-up on details or any broadcast and downloads here.

Watch recording

Overview

CIHT Cymru logo

 

This event is jointly held with the Chartered Institution of Highways and Transportation (CIHT)

The A483/A489 Newtown Bypass consists of 6.5km of new 2+1 carriageway and 1km of new side roads on the side of the Severn valley to the south of Newtown. Construction began in February 2016 and the bypass was open to traffic in February 2019.

The presentation on the Newtown Bypass will cover a brief history of the scheme including the route selection study, design development and statutory process. The main focus of the presentation will be on the construction stage of the bypass which will include the detailed design, the engineering challenges of moving 2.5 million tonnes of earth and rock with challenging ground conditions and topography and the construction of 11 structures and 17 culverts.

The presentation will also include the health and safety achievements, explain the environmental challenges and mitigation measures that were implemented as well as the economic, social and cultural sustainability benefits that were successfully delivered.

Watch the Newtown Bypass Flyover video - please note that this video does not have any sound

For more information please contact:

Felicity White