Pines Hotel Cliff Stabilisation: Turning adversity into opportunity, Cardiff

26 October, 2017 | 17:30 - 19:00

Venue address:

Cardiff School of Engineering
Trevithick Lecture Theatre
Trevithick Building
Cardiff CF24 3AA
United Kingdom
Pines Hotel Cliff Stabilisation scheme
Pines Hotel Cliff Stabilisation scheme

About this event

The Pines Hotel in Swanage is located at the top of 30m-high cliffs in the Wealden Formation, which are prone to coastal erosion and landsliding that posed a serious threat to the hotel. Despite complex ground conditions, exceptionally difficult design issues and logistical challenges, cliff stabilisation works were successfully carried out in order to safeguard the future of the hotel.

These comprised soil nails, a reinforced sprayed concrete soil nailed wall, bored pile walls, trench drains, and sub-horizontal drilled drains. The project received the Ground Engineering Awards UK Project of the Year with a geotechnical value of between £1M and £3M for effective logistical problem solving and counterintuitive innovation.

Event materials

The following materials are available for download:

Register your attendance

To book your place, simply click the 'book now' button below and follow the onscreen instructions.

If you're not already an ICE member, you can register to receive updates on our latest events.

If you experience any issues, please contact the event administrator: cherry.cronly@ice.org.uk.

Book now

Disclaimer: Any views or opinions expressed on any matters by the presenters or participants during or in connection with this presentation are solely the views of the authors of the respective comments and/or opinions and must not be taken to be the views of ICE or any other organisation. ICE makes no representations, warranties or assurances concerning any information provided in these presentations and accepts no responsibility for the content and/or accuracy.

Top