Carlos Herranz
Mott MacDonald
Event organised by The British Tunnelling Society
Los Angeles Metro is constructing a light rail corridor beneath Downtown Los Angeles - The Regional Connector Transit Corridor (RCTC). To provide operational flexibility, RCTC required a track crossover adjacent to one of the stations. Right of way constraints required the crossover be constructed at relatively shallow depth using Sequential Excavation Methods (SEM), resulting in what is believed to be the largest mined cross section in Los Angeles.
Challenges faced for the SEM cavern design and construction included strict limits for tunnelling induced displacements in surrounding structures and high seismic design loads with 2,500 year return periods. This presentation describes the design approach of the SEM cavern, with an emphasis on the seismic analysis, as well as the actual conditions faced during construction.
Mott MacDonald
Aimed at students, this series of seven webinars which runs until May 2025 will enable you to learn about professional life from recent graduates from across the industry.
This is an opportunity for Technicians to gather online to discuss ways in which we can help ourselves, each other and the ICE to provide ongoing learning and experience in the wide world of civil engineering.
The last in our series of online events for new engineers and technicians starting their Initial Professional Development (IPD). It is an opportunity to learn about the level of understanding needed for to demonstrate the Knowledge (K) level on an ICE training agreement or mentor supported scheme.