
Carlos Herranz
Mott MacDonald
Event organised by The British Tunnelling Society
Los Angeles Metro is constructing a light rail corridor beneath Downtown Los Angeles - The Regional Connector Transit Corridor (RCTC). To provide operational flexibility, RCTC required a track crossover adjacent to one of the stations. Right of way constraints required the crossover be constructed at relatively shallow depth using Sequential Excavation Methods (SEM), resulting in what is believed to be the largest mined cross section in Los Angeles.
Challenges faced for the SEM cavern design and construction included strict limits for tunnelling induced displacements in surrounding structures and high seismic design loads with 2,500 year return periods. This presentation describes the design approach of the SEM cavern, with an emphasis on the seismic analysis, as well as the actual conditions faced during construction.
Mott MacDonald
A five-session course delivered by industry experts focusing on key aspects of contracts used in Civil Engineering.
Join us for the next webinar of the series from the Infrastructure Client Group Productivity Task Group where we will explore the role of error in infrastructure productivity
Join ICE West Midlands Birmingham, Solihull and Black Country Branch for a lunchtime webinar on Façade Remediation.