- Date
- 25 November 2020
- Time
This event has now ended
Watch recording
Overview
The earthquake which struck Nepal in 2015 was a humanitarian disaster. Not only did it inflict tragic loss of life and livelihoods, it also destroyed parts of Kathmandu's unique UNESCO World Heritage site. These monuments were not just ornate structures but living monuments playing central roles in the daily lives of thousands. Their rehabilitation was of economic importance as they represent a major source of tourist income and employment. Unfortunately, the social and political desire to rapidly reconstruct resulted in the swift removal of many traditionally constructed foundations and their replacement with modern materials without assessments of whether these contributed to the collapse of an individual monument. These actions, combined with the wholesale removal and dumping of mixed modern and historic debris, contributed to a second, equally destructive, cultural catastrophe – irreversible damage to Kathmandu’s medieval archaeology.This talk outlines the impact of the earthquake before drawing attention to the series of damaging interventions by first responders, architects and engineers - activities which cumulatively contributed to Kathmandu’s second cultural catastrophe. It also describes the process by which a team mobilized by UNESCO and the Government of Nepal explored the potential of post-disaster archaeological interventions. This ranged from using geophysical survey to create risk maps of subsurface archaeological deposits for urban planners to undertaking a major post-disaster excavation in the debris of the Kasthamandap. Encountering hitherto unknown medieval construction techniques and sequences, this new knowledge has directly contributed to its reconstruction. The talk will conclude by reviewing the lessons learned from the cultural impacts of the Gorkha Earthquake and the remaining challenges facing heritage managers.
More like this
- Type
- Webinar
Delivery of the Belfast Tidal Flood Alleviation Scheme
Join us to hear from the client, the Department for Infrastructure, the client’s representative, AtkinsRéalis, and D&B contractor, Charles Brand, as they describe the design and construction of the flood defence scheme protecting Belfast from tidal flooding to 2080.
- Type
- Webinar
Careers talks
Aimed at students, this series of seven webinars which runs until May 2025 will enable you to learn about professional life from recent graduates from across the industry.
- Type
- Webinar
Implementation of TfN's northern transport strategy
This is your chance to influence how Transport for the North (TfN) bring their Strategic Transport Plan to life across the North. Input your views, engage with others, and hear from TfN’s interim strategy director.