- Date
- 10 October 2023
- Time
This event has now ended
Overview
Join the ICE East Midlands Nottingham, Leicester and Derby (NLD) branch for this presentation on HS2 lime stabilisation innovation. The UK’s HS2 rail project will connect London to major cities with trains operating at speeds of up to 400km per hour. The performance requirements for HS2 embankments require a stiff fill material durable to environmental conditions for a 120-year design life. Much of the natural ground along the HS2 route yields cohesive fills which soften when wet, and do not meet this requirement. As an alternative to importing over 10 million square metres of quarried granular fill for phase one of the project alone, lime stabilisation is being used to improve required stiffness.
This presentation will demonstrate the collaboration between Balfour Beatty Vinci and Dr Paul Beetham of Nottingham Trent University and is a great opportunity to those interested in learning more about lime stabilisation.
This event has been organised the ICE East Midlands Nottingham, Leicester and Derby (NLD) branch.
Sustainable Development Goals:
More like this
- Type
- Webinar
Delivery of the Belfast Tidal Flood Alleviation Scheme
Join us to hear from the client, the Department for Infrastructure, the client’s representative, AtkinsRéalis, and D&B contractor, Charles Brand, as they describe the design and construction of the flood defence scheme protecting Belfast from tidal flooding to 2080.
- Type
- Webinar
Careers talks
Aimed at students, this series of seven webinars which runs until May 2025 will enable you to learn about professional life from recent graduates from across the industry.
- Type
- Webinar
Implementation of TfN's northern transport strategy
This is your chance to influence how Transport for the North (TfN) bring their Strategic Transport Plan to life across the North. Input your views, engage with others, and hear from TfN’s interim strategy director.