- Date
- 16 January 2020
- Time
This event has now ended
Overview
The Boston Barrier scheme is part of a phased approach to reduce the risk of tidal flooding to over 14,000 properties and 500 businesses.
The 25m steel rising cill sector gate and the construction is being installed and built on a working river, with waterways both upstream and downstream used regularly. Other factors taken into account, along with the ease of navigation for vessels, was the design of the defence, build components, minimising risk, and utilising offsite construction.
The scheme is deemed a National Priority Project within the Environment Agency’s Six Year Programme and is fully funded by the Government’s Flood Defence Grant in Aid. Once operational Boston’s tidal flood barrier will offer the best standard of protection against tidal flooding outside of London.
In this lecture, Boston Barrier Project Director, Adam Robinson, will explain the history of the scheme and give an overview of the project to date.
More like this
- Type
- Webinar
Careers talks
Aimed at students, this series of seven webinars which runs until May 2025 will enable you to learn about professional life from recent graduates from across the industry.
- Type
- Lecture
Alternative dispute resolution workshop: the role of technology and digitalisation in modern construction disputes
Join us for the ICE’s 16th Alternative Dispute Resolution workshop to discover the intricacies of adjudication in the UK. This year’s workshop will look at the role of technology and digitalisation in modern construction disputes.
- Type
- Webinar
Restoration of the 156-year-old barmouth viaduct
The presentation describes the successful integration of existing, temporary, and permanent works in the renewal of the metallic hog-back spans of the Grade II* listed Barmouth Viaduct.