A diver-under structure was required to take two railway lines beneath the East Coast
Main Line, removing a key bottleneck on the network. A 150m long, 8m high, 11.5m
wide, 750m radius curved reinforced concrete box weighing 11,000T was constructed
offline and then jacked 165m into position during a 9-day partial closure of the main
line.
In this lecture, Matt Hadden will discuss the engineering challenges faced in the
construction of the scheme.
More like this

- Type
- Webinar
Careers talks
Aimed at students, this series of seven webinars which runs until May 2025 will enable you to learn about professional life from recent graduates from across the industry.

- Type
- Webinar
Lunch and Learn: The Waterside Bridge
Join the ICE East Midlands North Nottingham, North Derby Branch lunch and learn webinar on the Waterside Bridge.

- Type
- Webinar
5-week course: contracts
A five-session course delivered by industry experts focusing on key aspects of contracts used in Civil Engineering.