- Date
- 18 March 2021
- Time
This event has now ended
Overview
A diver-under structure was required to take two railway lines beneath the East Coast
Main Line, removing a key bottleneck on the network. A 150m long, 8m high, 11.5m
wide, 750m radius curved reinforced concrete box weighing 11,000T was constructed
offline and then jacked 165m into position during a 9-day partial closure of the main
line.
In this lecture, Matt Hadden will discuss the engineering challenges faced in the
construction of the scheme.
More like this
![Delivery of the Belfast Tidal Flood Alleviation Scheme](/media/dushjg32/belfast-tidal-flood-lead.png?width=800&height=566&format=WebP&quality=100&v=1db5204ef021700)
- Type
- Webinar
Delivery of the Belfast Tidal Flood Alleviation Scheme
Join us to hear from the client, the Department for Infrastructure, the client’s representative, AtkinsRéalis, and D&B contractor, Charles Brand, as they describe the design and construction of the flood defence scheme protecting Belfast from tidal flooding to 2080.
![Careers talks](/media/v4xg4wyn/career-talks.jpg?width=800&height=566&format=WebP&quality=100&v=1d8db0883885180)
- Type
- Webinar
Careers talks
Aimed at students, this series of seven webinars which runs until May 2025 will enable you to learn about professional life from recent graduates from across the industry.
![Implementation of TfN's northern transport strategy](/media/hhybhmon/transport-for-the-north-lead.jpg?width=800&height=566&format=WebP&quality=100&v=1db4c9bc22cf650)
- Type
- Webinar
Implementation of TfN's northern transport strategy
This is your chance to influence how Transport for the North (TfN) bring their Strategic Transport Plan to life across the North. Input your views, engage with others, and hear from TfN’s interim strategy director.