Network Rail and Morgan Sindall – Werrington Grade Separation
The rail environment is unique in its requirement to minimise disruption to the operational rail network for major infrastructure projects. Werrington Grade Separation presented a unique technical challenge to install a very high skew structure under the East Coast Main Line to facilitate freight movements across the fast lines of the ECML with minimal disruption.
The method selected for this was using a curved portal structure, constructed offline of the ECML, and pushed into place during a 9-day partial closure of the ECML lines. A reduced operational service was maintained via the Stamford and GNGE Lines during the partial closure.
The unique feature of this structure was its curved nature. Selected to follow the line of the track on a constant curve, the 11,000T structure was built 160m away from its final resting place on a slab then jacked into place during the partial closure utilising slide tracks pre-installed within tunnels installed in advance. The presenter will describe the background to the challenge and present some of the key features of the construction and installation.
More like this

- Type
- Webinar
Careers talks
Aimed at students, this series of seven webinars which runs until May 2025 will enable you to learn about professional life from recent graduates from across the industry.

- Type
- Webinar
5-week course: health and safety
A five session course delivered by industry experts to develop in-depth knowledge of health, safety, and wellbeing in civil engineering within the UK.

- Type
- Webinar
Pushing boundaries: the role of nonlinear response history analysis in seismic design
This talk will cover the topic of Nonlinear Response History Analysis as a powerful tool for advancing seismic design.