As a civil engineer, do you know your responsibilities for Steelwork Temporary Conditions.

Purpose of guidance
It is nearly always the case when designing steelwork that more than one ‘Designer’ is involved.
In this situation it is imperative (and usually a statutory obligation) for clarity with regards to residual risk and further design needs.
This briefing note provides guidance for designers and their responsibilities for steelwork temporary conditions.
About this briefing note
This note is based around the statutory provisions of CDM2015 (Regulation 9 – Designer duties) and authoritative associated industry guidance:
- AD 435: Beams supporting precast planks: checks in the temporary condition (1)
- SCI publication P401: Design of composite beams using precast concrete slabs in accordance with Eurocode 4 (2)
And also:
- BS5975:2019+A1:2020 Code of practice for temporary works procedures and the permissible stress design of falsework
- BS EN 10902:2018 Structural Steel and Aluminium
These are of direct relevance to Permanent Works and Temporary Works Designers.
- Clause 8 of BS5975 sets out requirements for Permanent Works Designers
- Clause 9.3.1 of BSEN1090 sets out requirements for Permanent Works Designers regarding the design basis for the erection method.
Steelworks Briefing Note FINAL June 22
Content type: Information
Last updated: 25 July 2022
You may also be interested in@headerSize>

- Type
- Awards and competitions
Micro tunnel improving the UK’s water quality wins at ICE North West Awards
A motorway upgrade, bridge replacement and a school street safety initiative were also among this year’s award winners.

- Type
- Lecture
Earthquake Engineering Field Investigation Team mission: September 2023 Morocco earthquake
Discover key findings from the EEFIT mission following the Mw 6.8 Morocco Earthquake in September 2023. This talk explores the earthquake’s impact on structures and landslides, offering insights into damage patterns, building typologies, and coseismic landslide mechanisms.

- Type
- Webinar
Kincardine Bridge: reconstruction of the Southern Piled Viaduct
In late 2022, Balfour Beatty was appointed by Transport Scotland to deliver the £18m reconstruction of the Kincardine Bridge Southern Piled Viaduct. The new in situ five span reinforced concrete structure replicated the adjacent spans to maintain the historic aesthetic of this Category A listed asse…