Overview
The design and construction of the £1.5 billion A14 Cambridge to Huntingdon Improvement scheme presented a range of geotechnical challenges. The scheme had a large earthworks deficit where some 4 million cubic metres of the 7.2 million cubic metres of fill material required had to be won from borrow pits along the route. Mostly the founding conditions were chalky glacial till and heavily over-consolidated clays with piled foundations for all major structures. This provided the opportunity to optimize pile design to reduce the out-turn cost of the project.
The presentation will give an overview of the scheme and will describe the main aspects of the design and construction of the earthworks, retaining structures and structure foundations, including detail of the pile design methodology and pile test methods developed.
The project was short listed for the 2018 Ground Engineering Geotechnical Team of the Year and the organization of the multi located design team will be discussed.
More like this

- Type
- Webinar
CEng Communication Task Workshop Series
Open to everyone, this may be particularly useful to those preparing for their CEng professional review. Following the recent streamlining process, several changes are being implemented to the professional review process as of January 2022.

- Type
- Webinar
PAS 2080: the key to international decarbonisation
This event will highlight the critical role of PAS 2080: Carbon Management in Buildings and Infrastructure in driving global decarbonisation efforts.

- Type
- Webinar
NEC’s secondary option X29, climate change: NEC to save the world?
NEC’s options X29 is called ‘Climate change’ and allows a client to set targets for anything. And so, despite its name it can be used to set targets for eg things affecting operational cost or even ‘social value’