Overview
An ALARP study has been undertaken to determine proportionate reservoir safety improvement works at the Category A Buckshole Reservoir in Hastings, East Sussex. The study addressed a recommendation as to measures to be taken in the interests of safety following a statutory inspection in June 2016 under Section 10 of the Reservoirs Act 1975.
The inspection report concluded that the service spillway would not accommodate the design flood flow and damage to the dam during extreme flood events was likely, possibly leading to a breach failure. The study examined a range of flood events to develop risk curves associated with the estimated likely loss of life and property damage resulting from dam failure. Using the risk curves, it was then possible to determine the flood event that yielded the greatest incremental consequences of dam failure.
The relevant flood event in this instance was shown to be an event significantly less severe than the design flood event. This was then used to determine the most appropriate level of reservoir safety works based on ALARP proportionality calculations. The results of the study highlighted that the use of risk curves can provide a more accurate basis for an ALARP assessment of reservoir safety improvement works, giving an improved outcome in terms of reduction in risk and the cost to the reservoir owner.
More like this
- Type
- Webinar
Careers talks
Aimed at students, this series of seven webinars which runs until May 2025 will enable you to learn about professional life from recent graduates from across the industry.
- Type
- Webinar
Technician tea break: January
This is an opportunity for Technicians to gather online to discuss ways in which we can help ourselves, each other and the ICE to provide ongoing learning and experience in the wide world of civil engineering.
- Type
- Webinar
Attribute 1 – Understanding and Practical Application of Engineering
The last in our series of online events for new engineers and technicians starting their Initial Professional Development (IPD). It is an opportunity to learn about the level of understanding needed for to demonstrate the Knowledge (K) level on an ICE training agreement or mentor supported scheme.