Overview
Joint presentation on the technical design and construction methodologies for the remedial works to replace the footway panels on the Menai Suspension Bridge.
Following a Principal Inspection of the Menai Suspension Bridge in 2020, the cantilevered footway panels were categorised as a high category defect with spalling at the soffit of most of the panels.
This presentation will discuss the optioneering phase with WSP as the Principal Designers for the scheme, the involvement of Spencers through an informal ECI arrangement and Principal Contractor during the construction phase and progress of the works on site.
This is a joint presentation of WSP, The Spencer Group and UK Highways A55 team about the technical design and construction methodologies for the remedial works to replace the footway panels.
More like this

- Type
- Webinar
What are the critical Temporary Works for your next construction project?
The presentation will provide an opportunity to identify what is genuinely critical on construction projects rather than simply discussing the topic of temporary works engineering. Consideration will be given to what potential temporary works might be on your next project and importantly, what makes…

- Type
- Webinar
Personal perspectives on ICE Fellowship journeys
What does it take to become an ICE Fellow? Hear first-hand reflections from two recently successful Fellows as they share their experiences, practical tips and lessons learned, helping you understand whether Fellowship could be the next step in your professional journey.

- Type
- Lecture
ICE Presidential Address 2026
Join our 162nd President, Julie Wood, as she shares her vision for her year and encourages the sector to improve infrastructure delivery by building smarter connections across projects and sectors.