- Date
- 29 September 2026
- Time
- 13:00 - 17:00 BST (GMT+1)
- Location
-
VolkerFitzpatrick Northern Compound RAF Brize Norton Carterton Oxfordshire, OX18 1PL United Kingdom
This event has now ended
Overview
The RAF Brize Norton Airfield Improvement Works are a major £180 million infrastructure investment programme designed to modernise and enhance the RAF's principal air mobility hub. Delivered through the RAF's Aircraft Operating Surfaces (AOS) Programmatic Approach, the project includes the full reconstruction of the station's three-kilometre runway, refurbishment of taxiways and associated infrastructure, replacement of airfield lighting systems, and improvements to drainage and other critical airfield assets.
The programme is being delivered on behalf of the Royal Air Force and Defence Infrastructure Organisation (DIO), with VolkerFitzpatrick appointed as the principal construction contractor and AECOM serving as the Technical Services Provider. Construction commenced in 2026 using a phased delivery approach to minimise operational impact while maintaining the Air Mobility Force's ability to fulfil global commitments.
Once complete, the project will provide a safer, more resilient and future-proofed airfield, ensuring RAF Brize Norton remains capable of supporting strategic air mobility, operational deployments and humanitarian missions for decades to come. The overall programme is expected to be completed in 2027 and represents one of the most significant recent investments in RAF airfield infrastructure.
The site visit is open exclusively to ICE Thames Valley Early Career Network (ECN) members, and places are strictly limited to 20 attendees. The visit will provide a unique opportunity to gain first-hand insight into a major defence AOS project in delivery, as well as meet and network with representatives from the Royal Air Force, Defence Infrastructure Organisation, AECOM and VolkerFitzpatrick.
Identification or nationality requirements
Personnel to bring photo identification to gain access. No restrictions on nationality.
Photography
No photography to be taken on the site visit.
PPE requirements
Attendees must provide and wear their own PPE . Those who do not arrive with the required PPE will not be permitted to take part in the site visit.
Required PPE: Safety helmet, safety boots, high-visibility clothing (jacket or vest), safety glasses/eye protection, and gloves.
Transport and parking
Attendees are required to arrive under their own arrangements. As car parking on-site is limited, car sharing is advised where possible.
Programme
Arrival, registration and lunch
Welcome and project overview briefing
Site visit (PPE mandatory)
Questions and coffee
Close
Sustainable Development Goals:
More like this

- Type
- Webinar
5-week course: sustainability
This course is designed to give developing professionals a strong foundation in sustainable engineering, equipping them with the knowledge and practical skills to effectively integrate sustainability into their work.

- Type
- Lecture
ICE West Midlands Shrewsbury Branch lunch and learn: EPS solutions for civil and structural applications
Join the ICE West Midlands Shrewsbury Branch for this webinar to explore how expanded polystyrene (EPS) solutions are transforming infrastructure projects through sustainable, lightweight ground engineering approaches, practical design insight and real world project applications.

- Type
- Webinar
Listening to the universe: civil engineering for the Einstein Telescope
The Einstein Telescope (ET) is a proposed European third-generation underground gravitational wave observatory housed in up to 30km of new tunnels. The event will focus on the complex geological, civil, and environmental engineering challenges.