Overview
This presentation is a summary of work undertaken in 2014 to secure a temporary LIDAR unit to the Bell Rock Lighthouse. A large 600MW wind farm was proposed just 5km from Bell Rock and the LIDAR purpose was to log wind data in the area over a two year period. The presentation slides show the design process, including survey, concept design, drawings and construction over three separate site visits throughout 2014. In addition, the presentation looks at the Bell Rock build and the inspiration for it, specifically the Smeaton light in Plymouth and other wave washed lighthouses around the coast of the UK.
For further information, contact [email protected]
More like this


- Type
- Webinar
Technician Timeout - ICE Pathways: Advancing your professional journey and industry impact
This is an opportunity for Technician members (EngTech MICE/FICE) and those wishing to become qualified at EngTech grade to come together to discuss issues that are important to technicians.

- Type
- Webinar
Your money timeline
An extra-length webinar to guide you through your financial priorities on a decade-by-decade basis! Planning ahead has never been so easy!