Phil Evans
Laing O'Rourke
project engineer
A giant on the Liverpool waterfront, the new Everton stadium on Bramley-Moore Dock stands proud against the River Mersey.
Organised by ICE Merseyside, this presentation will be detailing the new stadium’s reinforced concrete frame and bowl, with a focus on modern methods of construction, the structural steel frame by subcontractor Severfield, and the impressive external works.
The speakers will give insight into the construction of a major project in the UK and how Laing O'Rourke have delivered the project, utilising innovative solutions to combat difficult weather conditions.
As a precursor to this event, it is encouraged to watch back the John Sargent Lecture: Dock filling for the new Everton stadium project at Bramley-Moore Dock, for an insight into how the existing dock was prepared.

A useful five session course delivered by industry experts focussing on key aspects of finance in Civil Engineering.

An informal careers talk series designed to give an insight into the wide range of career opportunities available within civil engineering. Each talk, a different civil engineering professional will share their career journey, experiences and current role, providing an authentic perspective on worki…

Join this webinar exploring how England’s next generation of reservoirs will be built and how infrastructure professionals in the water sector can share their delivery insights over the coming years.