Tim Newman
chartered geologist
Event organised by The British Geotechnical Association
Tim Newman and the BGA explain the struggles that have been faced during the Thames Tideway Tunnel excavations.
The Thames Tideway Tunnel is a 25 km long stormwater storage tunnel, up to 65m deep beneath central London and incorporating twenty shafts and ten smaller diameter connection tunnels. It has been constructed through the entire London Basin geological sequence which has had a significant influence on its design.
The large-scale underground structures excavated during construction have facilitated observations of the in-situ geology and revealed sedimentary characteristics that could not be fully evident in disturbed samples from ground investigation boreholes and laboratory tests. These have led to significant improvements in understanding the in-situ groundmass behaviour of several strata within the sequence and their impact on the performance of different construction techniques.
chartered geologist
The talk explores performance-based fire safety strategies for energy infrastructure, highlighting case studies that enhance safety, reduce downtime, and support sustainability through advanced modelling and interdisciplinary collaboration.
Join this live lunchtime session designed for early-career civil or infrastructure graduate engineers or apprentices in the Republic of Ireland as we unpack ICE’s Initial Professional Development (IPD) journey.
This talk from the Royal National Institute of Blind People will focus on inclusive design and the challenges faced by blind or partially sighted individuals. The session aims to equip civil engineers with the knowledge and insights needed to create environments that are accessible to all.