- Date
- 17 June 2021
- Time
This event has now ended
Overview
The main cooling water supply for the Hinkley Point C nuclear power station will be fed from four intake head’s which will be located on the seabed of the Bristol Channel. The water will travel along long 2 separate segmentally lined tunnels into the power plant completing its loop by returning to sea via a third tunnel. Onshore, the tunnelling construction works include 3 shafts, 8 primary lined tunnels and a number of complex secondary lined structures.
In this lecture, Pat & Matt will discuss the many engineering challenges faced in the construction of these works and how the team overcame unique logistical challenges, difficult ground conditions and challenging weather to build the Head’s and the tunnels to nuclear standards throughout the global pandemic.
More like this

- Type
- Webinar
5-week course: contracts
A five-session course delivered by industry experts focusing on key aspects of contracts used in Civil Engineering.

- Type
- Lecture
The Princess Royal Award for Emerging Engineers: Yorkshire and Humber final 2026
Join the online audience and show your support for the two Yorkshire and Humber finalists, as they present their papers at the regional final of the Princess Royal Award for Emerging Engineers.

- Type
- Webinar
IEng Communication Task Group: Professional Commitment
This series of events is aimed at those preparing for their Professional Review at Incorporated level and will provide advice and guidance on how to approach the communication task, against various industry specific themes.