Overview
The main cooling water supply for the Hinkley Point C nuclear power station will be fed from four intake head’s which will be located on the seabed of the Bristol Channel. The water will travel along long 2 separate segmentally lined tunnels into the power plant completing its loop by returning to sea via a third tunnel. Onshore, the tunnelling construction works include 3 shafts, 8 primary lined tunnels and a number of complex secondary lined structures.
In this lecture, Pat & Matt will discuss the many engineering challenges faced in the construction of these works and how the team overcame unique logistical challenges, difficult ground conditions and challenging weather to build the Head’s and the tunnels to nuclear standards throughout the global pandemic.
More like this

- Type
- Webinar
ICE Pathways Coffee: technical curiosity - broadening your perspective
Technical Curiosity is a key pillar of building a successful career, and Pablo Gugel, director of sustainability and AI at Bryden Wood, will present and lead a discussion on Technical Curiosity: Broadening your perspective.

- Type
- Webinar
Ecosystem Strategy principles and learning gained from Project 13 adopters
Aligning with publication of Ecosystem Strategy paper, this webinar explores how to implement aligned, integrated approaches that enhance infrastructure delivery, sharing Project 13 adopter insights and case studies demonstrating application, challenges and lessons learned.

- Type
- Webinar
Keeping it civil: different paths, one profession - designer
An informal careers talk series designed to give an insight into the wide range of career opportunities available within civil engineering. Each talk, a different civil engineering professional will share their career journey, experiences and current role, providing an authentic perspective on worki…