- Date
- 17 June 2021
- Time
This event has now ended
Overview
The main cooling water supply for the Hinkley Point C nuclear power station will be fed from four intake head’s which will be located on the seabed of the Bristol Channel. The water will travel along long 2 separate segmentally lined tunnels into the power plant completing its loop by returning to sea via a third tunnel. Onshore, the tunnelling construction works include 3 shafts, 8 primary lined tunnels and a number of complex secondary lined structures.
In this lecture, Pat & Matt will discuss the many engineering challenges faced in the construction of these works and how the team overcame unique logistical challenges, difficult ground conditions and challenging weather to build the Head’s and the tunnels to nuclear standards throughout the global pandemic.
More like this

- Type
- Webinar
5-week course: contracts
A five-session course delivered by industry experts focusing on key aspects of contracts used in Civil Engineering.

- Type
- Webinar
Let’s talk about… dementia
While dementia has no cure, there is care. This masterclass aims to provide practical support to those facing dementia.

- Type
- Lecture
Yorkshire and Humber Knowledge Sharing: Reinforcement fixing and stability using RECO clamps
Take the opportunity to find out about reinforcement fixing and stability and how RECO clamps can be used to improve the efficiency and safety of this site operation. Presented by Trevor Larkin, special products manager at Ischbeck.