- Date
- 17 June 2021
- Time
This event has now ended
Overview
The main cooling water supply for the Hinkley Point C nuclear power station will be fed from four intake head’s which will be located on the seabed of the Bristol Channel. The water will travel along long 2 separate segmentally lined tunnels into the power plant completing its loop by returning to sea via a third tunnel. Onshore, the tunnelling construction works include 3 shafts, 8 primary lined tunnels and a number of complex secondary lined structures.
In this lecture, Pat & Matt will discuss the many engineering challenges faced in the construction of these works and how the team overcame unique logistical challenges, difficult ground conditions and challenging weather to build the Head’s and the tunnels to nuclear standards throughout the global pandemic.
More like this

- Type
- Webinar
Road safety in Uganda: status, challenges, and audit practices
Uganda records among the highest road fatality rates in Sub-Saharan Africa. The presentation will examine the current road safety landscape, audit methodologies, and practical interventions for safer roads.

- Type
- Networking
A very Scilly problem: using biomimicry to inform climate resilient infrastructure
Whilst engineers struggle to adapt infrastructure for a changing climate, nature is already surviving and thriving in these conditions. Using a biomimicry approach, this presentation explores how organisms on the Isles of Scilly could inform climate resilience in the UK.

- Type
- Webinar
Climate change and urban flooding: why we fail to manage water in the built environment
Explore the growing challenges of water management, including urban flooding, declining public trust and climate pressures. Learn about the barriers to implementation and discover why we need more industry-wide reflection on effective, scalable solutions.