- Date
- 20 April 2021
- Time
This event has now ended
Overview
The Chiltern Tunnel South Portal Headwall has been designed to provide a subvertical face for the launch of the TBMs, having an approximate retained height of 20m. The face was designed to have an angle of 70 degrees above the tunnel crown, through 6 m of structureless chalk and drift deposits, and 80 degrees below the tunnel crown a further height of 14m. The subvertical face is essential to enable the beginning of the bore.
The South Portal structure is part of the wider South Cutting works, and interfaces with the Chiltern Tunnel at the headwall location. The tunnel portal extends South East for approximately 230m towards the Colne Valley Viaduct.
The route traverses down the side of a dry valley. These dry valleys often have a significant influence on the depth and type of drift deposits and weathering across the chalk hills.
This presentation will describe the various options considered for the headwall, the reasons for the selection of the soil nail solution, how detailed design and geotechnical risk management issues were resolved, and performance of the structure during construction.
More like this

- Type
- Webinar
5-week course: contracts
A five-session course delivered by industry experts focusing on key aspects of contracts used in Civil Engineering.

- Type
- Lecture
The Princess Royal Award for Emerging Engineers: Yorkshire and Humber final 2026
Join the online audience and show your support for the two Yorkshire and Humber finalists, as they present their papers at the regional final of the Princess Royal Award for Emerging Engineers.

- Type
- Webinar
IEng Communication Task Group: Professional Commitment
This series of events is aimed at those preparing for their Professional Review at Incorporated level and will provide advice and guidance on how to approach the communication task, against various industry specific themes.