Overview
Joint presentation on the technical design and construction methodologies for the remedial works to replace the footway panels on the Menai Suspension Bridge.
Following a Principal Inspection of the Menai Suspension Bridge in 2020, the cantilevered footway panels were categorised as a high category defect with spalling at the soffit of most of the panels.
This presentation will discuss the optioneering phase with WSP as the Principal Designers for the scheme, the involvement of Spencers through an informal ECI arrangement and Principal Contractor during the construction phase and progress of the works on site.
This is a joint presentation of WSP, The Spencer Group and UK Highways A55 team about the technical design and construction methodologies for the remedial works to replace the footway panels.
More like this

- Type
- Webinar
Wales National Travel Survey
We bring you a webinar on The Wales National Travel Survey, launched in March 2025, which collects representative data on how and why people travel in Wales, with early findings to be published in April 2026 and full annual results from Autumn 2026.

- Type
- Webinar
Engineering Excellence Community Forum: Building safeguards with the ICE Safety Risk Advisory Group
Join the July 2026 Engineering Excellence Community Forum online to hear updates on key Safety Risk Advisory Group workstreams, from tackling gaps in the provision of safety risk management guidance to operating specialist professional registers.

- Type
- Webinar
Let's talk about... trauma
To move towards healing, we must first understand what trauma is (and isn’t).