
Andy Sloan
COWI
Managing Director
Event organised by ICE
The Glendoe Hydro Electric project was the last major hydro scheme constructed in the UK and for the preceding three decades. Shortly after opening there was a catastrophic collapse in the headrace tunnel and extensive remedial works were required to recover the scheme. Andy was closely involved with events after the collapse.
In this presentation he will discuss the collapse, the mechanisms involved, some lessons learned and describe the recovery project. This talk is set against the back-drop of a potential renaissance of pumped storage hydro in Scotland.
COWI
Managing Director
Open to everyone, this may be particularly useful to those preparing for their CEng professional review. Following the recent streamlining process, several changes are being implemented to the professional review process as of January 2022.
Discover how recent innovations are improving the way we understand, test, and design for seismic risks in geotechnical engineering.