Skip to content
Type
Lecture

HS2 G2S Green Tunnel Improvements

Event organised by The British Tunnelling Society

Date
10 December 2026
Time
18:00 - 19:30 GMT
Location
Institution of Civil Engineers
One Great George Street
Westminster
London, SW1P 3AA
United Kingdom
Add to Calendar 10-12-2026 18:00 10-12-2026 19:30 false Europe/London HS2 G2S Green Tunnel Improvements https://www.ice.org.uk/events/upcoming-events/hs2-g2s-green-tunnel-improvements Institution of Civil Engineers, London

Also available online

Free

Overview

EKFB’s HS2 scope includes three Green Tunnels, which presented significant construction challenges. By 2024, progress on the tunnels was placing delivery of a critical project test length at risk.

The G2S Tunnel Team identified and implemented a series of strategic improvements to recover programme performance. Central to this approach was increased offsite prefabrication and manufacturing, combined with installation methods that maintained tunnel access and prioritised critical-path activities.

These changes accelerated delivery while enhancing efficiency. Additional benefits included improved quality control, reduced costs, and stronger safety performance.

In their presentation, Alexei & Christopher will outline the challenges faced and the key innovations implemented, including the transition to prefabricated invert slab reinforcement, shortlisted for the NCE Tunnelling Awards in the category of Innovation in Construction Execution & Supply Chain Collaboration.

Following the presentation, there will be a networking session in the ICE Kendal's bar.

Organised by

British Tunnelling Society

British Tunnelling Society

The BTS is a dynamic group of tunnelling professionals sharing knowledge within the industry.

Venue

Please accept marketing cookies and refresh the page to view this map.
Institution of Civil Engineers
One Great George Street
Westminster
London
SW1P 3AA
United Kingdom

Speakers

Alexei Bond

Alexei Bond

EKFB (Kier)

G2S Project Director

Read more

Alexei Bond

Alexei joined EKFB as G2S Project Director in 2024, leading the delivery of a 25km section of the HS2 alignment, including 5.2km of Green Tunnel, 16.5 million m³ of earthworks and 21 bridge structures. Previously, on Tideway West, he managed the delivery of Carnwath Road and Main Tunnel A before being promoted to Project Director, with responsibility for the completion, testing, commissioning and handover of all seven project sites.

During his tenure, he led a major redesign of key civil works that delivered a six-month programme saving on an 18-month construction programme, demonstrating a strong track record in leading complex infrastructure projects and driving programme performance. 

Christopher Barrett

Christopher Barrett

EKFB (BAM)

G2S Green Tunnel Senior Project Manager

Read more

Christopher Barrett

Chris has been a key member of the BAM Tunnelling team since joining in 2010 and is currently Senior Project Manager for the Chipping Warden and Greatworth Green Tunnels on EKFB’s HS2 G2S project.

Over his career, he has led the delivery of several complex tunnelling schemes, including the design and construction of the Silvertown Tunnel cross passages, incorporating extensive ground-freezing operations; the Tunnel B Connection on Tideway West, a critical interface between project contracts; and the Carnwath Road Shaft, a 40m-deep, 26m-diameter structure forming a key component of the Tideway Tunnel project.

For more information please contact:

Jayne de Ville & Elira Alushi

Sustainable Development Goals: