The paper supports the call for evidence that the ICE is running on behalf of the Infrastructure Client Group (and by extension the Construction Leadership Council) in order to identify how infrastructure delivery should be reinvented in the UK following Covid-19.
The paper provides insights into the following areas:
- Infrastructure network use before Covid-19
- The impact of Covid-19 lockdown measures on infrastructure demand and operations
- Attitudes towards public life after lockdown and social distancing measures have been lifted
- Potential impacts on planned major infrastructure programmes
The questions contained within the call for evidence are as follows:
- What other factors, or combination of factors, will determine attitudes to public life as we transition to a new normal?
- What other systemic changes, driven by lessons learned during the lockdown period, can we expect to be important as part of the new normal?
- Are our assumptions of the new priorities for infrastructure correct?
- What other changes to infrastructure provision will be needed and what assumptions sit behind that need?
- Have we made the correct assumptions on the changes in delivery that will be required, to deliver infrastructure as part of the new normal?
- What are the intermediate steps required to move us towards these new approaches to delivery?
- What other fundamental shifts are required to deliver concrete and long-lasting change in how we operationalise to deliver infrastructure to achieve societal requirements?
The call for evidence runs until 14 June. Representations can be made to ICE Policy.
The use of infrastructure systems – insights into the new normal
Content type: Policy
Last updated: May 2020
You may also be interested in

- Type
- Awards and competitions
New year, new BCIA? Industry awards announce major overhaul
Along with a new name and set of categories, the awards are offering the chance to enter for free.

- Type
- ICE Community blog
A day in the life building a footbridge in Eswatini
In the first blog of the Around the world with the ICE series, we follow Tim Ashworth to Eswatini, where he volunteered to build a footbridge.

- Type
- Webinar
A595 Moresby Hall Embankment
Join to hear Amey discussing the A595 Moresby Hall Scheme in Cumbria and the many challenges faced delivering the drainage improvement and embankment reconstruction works whilst mitigating road closures, in line with the Sellafield Nuclear Power Station civilian contingency plan.