Yazen Saleh discusses the implementation of green building and sustainability concepts, principles and techniques in the UAE.
In 2011, the UAE introduced Green Building regulation, which focused on energy reduction to avoid environmental pollution.
This included the implementation of green building and sustainability concepts, principles and techniques, such as the Renewable Energy tool, to assist with the reduction in energy waste.
Significant amounts of energy waste can be lost at the operational stage of a built asset.
The main causes of this energy waste have been cited as:
Types of energy waste can be divided into two principal groups: direct energy waste; and, indirect energy waste.
The direct waste relates to our daily energy consumption, while the indirect waste relates to the waste process.
The UAE construction industry has been set the goal of minimising its energy waste to 30% by 2030 (Saifur Rahman).
It plans to achieve this by using the renewable energy system instead of the traditional system.
By adopting green building design and sustainability at the design stage of construction projects, this can overcome the negative environmental and monetary impacts of energy waste.
Addressing these issues at the design stage has been rightly identified as the essential step toward sustainability.
To protect the natural environment from any hazard/threats from the construction industry, the following issues must be considered to avoid energy waste:
The adoption of BIM for improving collaboration on energy waste management in construction and operation needs to be considered and implemented at the design stage.
This use of BIM will assist in adequate collaboration and effective communication.
In this regard, BIM plays a key role in ensuring that all stakeholders are actively involved in decision-making right from the conception of the building project through its entire lifecycle.
The main benefit of adopting BIM for energy waste management is that it enables the creation of a federated model that could be evaluated and updated by all the project team.
The use of BIM will also engender design coordination, task harmonisation, clash detection, and process monitoring of energy waste management activities.
The tool used to help eliminate energy waste during the design stage is the Renewable Energy tool.
This is a technique whereby the design team, at the earliest stage, identifies where a renewable energy technique can be used to minimise energy waste
These techniques include using solar energy, wind power or solar-insulating glass.
Solar energy can be collected and converted in a few different ways, ranging from:
Wind can be used to pump water or to generate electricity – but the challenge is the need for a large open space to produce significant amounts of energy.
Solar insulating glass, which allows sunlight to pass through a window, while radiating and reflecting a large degree of the sun’s heat, allows indoor spaces to stay bright but much cooler than if normal glass were used.
The UAE construction industry is growing year after year, which can lead to large volumes of energy waste if not monitored, controlled or minimised through the design and operating stage.
Government bodies have been proactive in their approach to minimising energy waste by issuing various guidelines and implementing solar energy systems.
For example, the Mohammed bin Rashid Al Maktoum Solar Park is the largest single-site solar park in the world, based on the IPP (Independent Power Producer) model, and is instrumental to the Dubai Clean Energy Strategy 2050.
The solar park’s production capacity will reach 5,000MW by 2030 with investments totaling AED 50 billion. It will eventually save over 6.5 million tonnes of carbon emissions every year.
The incoming chair of the ICE North Wales Committee is launching a new opportunity for emerging talent.
The stamp features Sir Thomas Peirson Frank, the ICE’s 82nd President, as part of celebrations marking 80 years since the end of World War II.
Trustees discussed the annual report and examined the ICE's latest safety risk review.