- Date
- 02 November 2020
- Time
This event has now ended
Overview
Claridge’s, a world-famous five-star hotel in central London, commissioned contractor McGee to construct a five-storey basement beneath the existing hotel without disrupting hotel operations.
With all materials in and out of the site passing through a single window opening, the engineering solution involved mining underneath the existing foundation, hand-digging adits and vertical shafts for each of the 62 five-storey columns and foundations, then constructing the basement top-down.
Jim Mackey (McGee), Andy Pye and Alice Blair (Arup) will tell the structural story behind this incredible feat of construction.
Image shown courtesy of Daniel Imade, Arup
More like this

- Type
- Webinar
ICE Pathways Coffee: technical curiosity - broadening your perspective
Technical Curiosity is a key pillar of building a successful career, and Pablo Gugel, director of sustainability and AI at Bryden Wood, will present and lead a discussion on Technical Curiosity: Broadening your perspective.

- Type
- Webinar
Ecosystem Strategy principles and learning gained from Project 13 adopters
Aligning with publication of Ecosystem Strategy paper, this webinar explores how to implement aligned, integrated approaches that enhance infrastructure delivery, sharing Project 13 adopter insights and case studies demonstrating application, challenges and lessons learned.

- Type
- Webinar
Keeping it civil: different paths, one profession - designer
An informal careers talk series designed to give an insight into the wide range of career opportunities available within civil engineering. Each talk, a different civil engineering professional will share their career journey, experiences and current role, providing an authentic perspective on worki…