Skip to content
Type
Networking

A63 Castle Street Improvement

Event organised by ICE

Date
08 September 2026
Time
18:00 - 20:00 BST (GMT+1)
Location
The Hub
Arup offices
12 Wellington Place
Leeds, LS1 4AP
United Kindom
Add to Calendar 08-09-2026 18:00 08-09-2026 20:00 false Europe/London A63 Castle Street Improvement https://www.ice.org.uk/events/upcoming-events/ygg-a63-castle-street-improvement The Hub, Leeds

Free

Book now

Overview

Recent completion of the A63 Castle Street Improvement scheme marks an achievement in successful planning, design and execution of a complex ground engineering challenge.

An underpass and integral bridge now routes heavy mainline traffic below ground while two new ‘gateway’ footbridges improve the safety and experience of pedestrian traffic between the City Centre and Hull Marina. Several new retaining walls and a new 11m diameter pumping station shaft also contribute to the scheme’s significant transformation of Hull’s waterfront space.

Construction of a 400m long underpass up to 7m below ground in the problematic glacial and estuarine deposits of the Humber posed several significant geotechnical risks. Very soft organic clays, running sand, a confined chalk aquifer with 5m tidal range and piezometric surface near to ground level, all presented different challenges to design and construction. 

The underpass solution centred around a collection of specialist geotechnical techniques including; deep soil mixing, jet grouting, diaphragm walls and tension piles. The application of innovation and technical excellence was in how these techniques work together as a holistic solution and in how the interfaces were managed at all stages of the delivery. 

The scheme presented several unexpected challenges. Through early geotechnical site trials, novel technical governance structures and a truly collaborative project team, challenges were overcome and significant cost and programme impacts were mitigated.

The project was recently announced the Winner of the “projects with geotechnical value over £10m” category in the 2026 Ground Engineering Awards.

This presentation will expand upon and share the major successes, challenges and lessons learned across the delivery of the scheme from the designer’s perspective.

Venue

Please accept marketing cookies and refresh the page to view this map.
The Hub
Arup offices
12 Wellington Place
Leeds
LS1 4AP

Programme

18:00 - 18:30

In person networking

18:30 - 20:00

Presentation and Q&A

Speaker

Owen Flowers

Owen Flowers

Arup

principal geotechnical engineer

Read more

Owen Flowers

Owen Flowers CEng MICE is a principal geotechnical engineer in the Arup Leeds ground engineering team. He has over 15 years of experience focusing on geotechnical analysis and design across linear infrastructure, buildings and water infrastructure. He has been a core member of the A63 Castle Street team since 2019 beginning with delivery of detailed design packages, through to site supervision of site trials and lead geotechnical site representative throughout construction.